{"id":13362,"date":"2017-06-07T00:00:00","date_gmt":"2017-06-07T00:00:00","guid":{"rendered":"https:\/\/hafnarfjordur.is\/fyrstu-tillogur-um-legu-borgarlinu-kynntar\/"},"modified":"2022-10-25T09:00:20","modified_gmt":"2022-10-25T09:00:20","slug":"first-proposals-for-the-citys-location-presented","status":"publish","type":"post","link":"https:\/\/hafnarfjordur.is\/en\/fyrstu-tillogur-um-legu-borgarlinu-kynntar\/","title":{"rendered":"Initial proposals for the location of Borgarl\u00edna presented"},"content":{"rendered":"<p>A turning point will come<br \/>\nin preparation for the planned City Line, a new high-quality transport system that will receive<br \/>\na dedicated lane in the capital region's road network, when draft proposals for changes<br \/>\nin the Regional Plan for the Capital Region to 2040 and the Master Plan<br \/>\nthe six municipalities that are behind the Metro Line will be presented at a joint<br \/>\nthe meeting of the municipalities in Salnum today. Proposals will be presented there on<br \/>\nthe location of line routes and the main stops of the City Line and defined criteria for<br \/>\ndevelopment in the line's impact areas, but it is anticipated that the City Line will be<br \/>\nup to 57 km in length and that the project will be phased.<\/p>\n<p>The processing proposals currently in pre-publication are based on<br \/>\nthe options analysis of the Danish engineering firm COWI. In that work, consideration was given to<br \/>\nof how the capital region will develop in the coming decades. This is a proposal<br \/>\nan overall network of infrastructure to be built in phases. The aim is to<br \/>\nthat final proposals on the line's location will be available by the end of summer and that preparations<br \/>\nThe first phase is to be completed in early 2018.<\/p>\n<p> <a href=\"https:\/\/hafnarfjordur.is\/en\/media\/province\/borgarlinagreiningalinumskyrslamai2017.pdf\/\">See the interim report on the analysis of the Borgarl\u00edna lines<\/a> <\/p>\n<p>The cost of the Borgarl\u00ednu infrastructure is estimated at around<br \/>\n1.10-1.15 billion kr\u00f3na per kilometre at January 2017 prices and therefore<br \/>\nThe cost of the entire network, which will be built in phases, could amount to 63 to<br \/>\n70 billion kroner. <\/p>\n<p><strong>First<br \/>\nProposals for the City Line<\/strong><\/p>\n<p><img decoding=\"async\" data-src=\"https:\/\/hafnarfjordur.is\/wp-content\/uploads\/2022\/09\/FyrstutillogurBorgarlinu.jpg\" alt=\"Initial proposals for the city line\" src=\"data:image\/svg+xml;base64,PHN2ZyB3aWR0aD0iMSIgaGVpZ2h0PSIxIiB4bWxucz0iaHR0cDovL3d3dy53My5vcmcvMjAwMC9zdmciPjwvc3ZnPg==\" class=\"lazyload\" style=\"--smush-placeholder-width: 1200px; --smush-placeholder-aspect-ratio: 1200\/848;\"><\/p>\n<p><strong>Why?<\/strong><\/p>\n<p>It is estimated that over the next 25 years, the population of the capital region will increase by almost<br \/>\n40% or about 70,000, and will then have become almost 300,000. When we add<br \/>\nWith the growing stream of tourists, it is clear that traffic is set to increase significantly. If it remains<br \/>\nWith travel habits remaining unchanged, this increase will cause difficulties in transport and increased<br \/>\ndelays in traffic, despite huge investments in new<br \/>\ntraffic infrastructure. It is estimated that, unless changes are made, journey times could increase by up to<br \/>\n65% and traffic delays of just over 80%. <\/p>\n<p>The aim of the municipalities with the City Line is to increase<br \/>\nthe importance of public transport in the capital region. That will not happen without<br \/>\ninfrastructure for high-capacity public transport will be built. About<br \/>\nThe same principles apply to the urban line as to the planning of infrastructure for other modes of transport, e.g.<br \/>\ninfrastructure. One must look decades into the future, so that the milestones which are built<br \/>\nwould eventually become a natural whole. It is clear that traffic matters<br \/>\nof the capital region will not be solved by either a more robust road network or<br \/>\npublic transport. Therefore, the interaction between these two solutions needs to be established and there<br \/>\nPublic transport will play an important role for the region's residents. One of the main challenges for the future urban environment is<br \/>\nlack of space and for that reason, foreseeable technological advances with self-driving<br \/>\nCars can never replace high-capacity public transport.<\/p>\n<p><strong>Environmentally friendly<br \/>\nand a quick mode of transport<\/strong><\/p>\n<p>The City Line is the result of extensive and close collaboration.<br \/>\nof the municipalities in the capital region in recent quarters and behind it lies<br \/>\nA detailed analysis of the future of transport in the capital region in collaboration with<br \/>\nThe roadworks.&nbsp; <\/p>\n<p>The trams on the City Line will be electric and will travel in dedicated lanes and receive<br \/>\npriority at traffic lights. It increases reliability and speed, so that journey time<br \/>\nbecomes more competitive with other modes of transport. The proposed Metro Line is therefore cost-effective.<br \/>\nand an environmentally friendly way to increase transport capacity between the municipalities and make it easier for them<br \/>\nable to accommodate an increase in population and tourists of almost 40% by the year<br \/>\n2040 without the load on the main road network increasing in proportion. It is anticipated<br \/>\nhigh travel frequency which can be 5-7 minutes during peak times. Emphasis will be placed<br \/>\nwell-appointed, covered bus shelters, with ticket vending machines and information boards<br \/>\nwhich show in real time when the next tram is arriving. The trams will stop right at<br \/>\nramp platforms that will be at the same height as the wagons' floor, making access easier for<br \/>\nall. <\/p>\n<p><strong>The start of the planning process for the City Line<\/strong><\/p>\n<p>The development of Borgarl\u00edna is in accordance with the regional plan for the capital region.<br \/>\nfrom 2015 but an agreement on the preparation of the line was signed by the mayor<br \/>\nand to the mayors of the other municipalities in the capital region in December 2016.<br \/>\nThe aim is to have the final proposals for the route of the Borgarl\u00edna ready by the end of the summer.<br \/>\n2017. Today's presentation in the Hall marks<br \/>\na milestone now that the public and stakeholders can familiarise themselves with the draft of<br \/>\nproposals for the layout of Borgarl\u00ednan, but the deadline for submitting comments or<br \/>\nComments are open until 20 June 2017. Comments and suggestions must be<br \/>\nwritten and must be received by the SSH office or the relevant office.<br \/>\nmunicipal.<\/p>\n<p><strong>Further information <\/strong>provides&nbsp;<strong>Hrafnkell<br \/>\nOn Proppe,<\/strong> Regional Planner of the Association<br \/>\nmunicipalities in the capital region, telephone: 892 2698 \u2013 email:<br \/>\n<a href=\"mailto:hrafnkell@ssh.is\">hrafnkell@ssh.is<\/a><\/p>\n<p>See more at <a href=\"http:\/\/ssh.is\/borgarlina\"> The urban line.is<\/a> <\/p>","protected":false},"excerpt":{"rendered":"<p>\u00de\u00e1ttaskil ver\u00f0a \u00ed undirb\u00faningi fyrirhuga\u00f0rar Borgarl\u00ednu, n\u00fds h\u00e1g\u00e6\u00f0a samg\u00f6ngukerfis sem f\u00e1 mun s\u00e9rr\u00fdmi \u00ed gatnakerfi h\u00f6fu\u00f0borgarsv\u00e6\u00f0isins, \u00feegar vinnslutill\u00f6gur um breytingar \u00e1 sv\u00e6\u00f0isskipulagi h\u00f6fu\u00f0borgarsv\u00e6\u00f0isins til 2040 og a\u00f0alskipulagi sveitarf\u00e9laganna sex sem standa a\u00f0 Borgarl\u00ednu ver\u00f0a kynntar \u00e1 sameiginlegum fundi sveitarf\u00e9laganna \u00ed Salnum \u00ed dag. \u00dear ver\u00f0a kynntar till\u00f6gur um sta\u00f0setningu l\u00ednulei\u00f0a og helstu st\u00f6\u00f0va Borgarl\u00ednu og [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":16089,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_breakdance_hide_in_design_set":false,"_breakdance_tags":"","wds_primary_category":0,"footnotes":""},"categories":[12],"tags":[],"class_list":["post-13362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-frettir"],"acf":[],"_links":{"self":[{"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/posts\/13362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/comments?post=13362"}],"version-history":[{"count":0,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/posts\/13362\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/media\/16089"}],"wp:attachment":[{"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/media?parent=13362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/categories?post=13362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/hafnarfjordur.is\/en\/wp-json\/wp\/v2\/tags?post=13362"}],"curies":[{"name":"WordPress","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}