On 10.06.11, Alcan in Iceland applied for permission to construct an extension to the existing thickener plant (building no. 60). The extension will be a continuation of the main form of the existing building. In accordance with drawings by Bæring Bjarni Jónsson dated 31.05.11. Stamped drawings from the Public Health Authority of Hafnarfjörður and Kópavogur and the Capital Region Fire and Rescue Service were received on 10.06.11.
Planning and Building Control Officer's Hearing
in the meeting room on the 3rd floor, Strandgata 6
Present at the meeting
- Bjarki Jóhannesson Stage manager
- Malfríður Kristjánsdóttir employee
- Sigurður Steinar Jónsson employee
Secretary
- Bjarki Jóhannesson Director/Planning and Building Officer
-
Part A of building permits
-
1106129 – Straumvík, extension to building 60
The Planning and Building Officer approves the building plans in accordance with Article 11 of the Building Regulations No. 160/2010. A building permit will be issued once the conditions of paragraphs 1-4 of Article 13 of the Building Regulations have been fulfilled.
-
1106128 – Straumsvík Unit 82, alteration
Alcan in Iceland Ltd. applied on 10 June 2011 for a licence to convert a concrete outbuilding, building no. 82, into an oil pump station in accordance with drawings by Bærings Jónsson dated 1 June 2011, as well as stamps from the Fire Service and the Health Inspectorate.
The Planning and Building Officer approves the building plans in accordance with Article 11 of the Building Regulations No. 160/2010. A building permit will be issued once the conditions of paragraphs 1-4 of Article 13 of the Building Regulations have been fulfilled.
-
1105483 – Lækjargata 10b, dormer
Freyja Árnadóttir, on 26.05.2011, applies to add a gable to the south side of the house, and also to extend the porch by 50cm to the south, in accordance with drawings by Aðalsteinn V. Júlíusson dated 24.05.2011. A report from the House Preservation Committee has been received.
The Planning and Building Officer approves the building plans in accordance with Article 11 of the Building Regulations No. 160/2010. A building permit will be issued once the conditions of paragraphs 1-4 of Article 13 of the Building Regulations have been fulfilled.
Part B: Organisational Matters
-
1105112 – Experimental building, site application
A request from Hans Óli Hansson dated 04.05.11 regarding a plot for an experimental building is considered. The Town Council referred the request on 11.05.11 to the Planning and Building Department for comment.
The Planning and Building Officer requests that the applicant attends an interview to provide further details of their proposals.
-
1101039 – Blikaás 42-44. Final inspection incomplete.
Blikaás 42-44. Final inspection incomplete. Test drawings approved 27/04/11.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 09:00 in accordance with section 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1101042 – Bæjarhraun 4. Final inspection incomplete.
Bæjarhraun 4. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 09:30 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012244 – Furuvellir 2. Final inspection incomplete.
Furuvellir 2. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 10:00 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012245 – Hlíðarás 1. Final inspection incomplete.
Hlíðarás 1. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 10:30, in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012246 – Hlíðarás 47. Final inspection incomplete.
Hlíðarás 47. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 11:00 in accordance with section 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012252 – Gauksás 55. Final inspection incomplete.
Gauksás 55. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 11:30 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012255 – Drekavellir 26. Final inspection incomplete.
Dragon Fields 26. Final inspection incomplete. A status inspection was carried out on 23 March 2010.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 13:00 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012249 – Nordurbakki 5abc. Final inspection incomplete.
North Bank 5abc. Final inspection incomplete. A status inspection was carried out on 28 January 2010.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 13:30 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012233 – Glitvellir 36. Final inspection incomplete.
Glitvellir 36. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 14:00 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012242 – Elves' Age 31. Final review incomplete.
Phase 31. Final inspection incomplete. Drawings approved 7.6.11.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 14:30 in accordance with Article 36 of the Building Regulations Act No. 160/2010. The building supervisor is required to take the measures stipulated by the Act. See attached comments
-
0902281 – Álfhella 1, final settlement.
Álfhella 1. Final inspection incomplete. A status inspection was carried out on 23/05/11.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 15:00 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012250 – Nordurbakki 11. Final inspection incomplete.
North Bank 11 abc. Final inspection incomplete. A status inspection was carried out on 9 February 2011.
The Planning and Building Officer has scheduled a final inspection for 30.06.11 at 15:30 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1101044 – Thrastará 44. Final inspection incomplete.
Trestle 44. Final inspection incomplete. A status inspection was carried out on 5 May 2011.
The Planning and Building Officer has scheduled a final inspection for 30 June 2011 at 16:00 in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
-
1012247 – Nordurbakki 17a. Final inspection incomplete.
North Bank 17a. Final inspection incomplete.
The Planning and Building Officer has scheduled a final inspection for 16:30 on 30 June 2011, in accordance with Article 36 of the Building Regulations No. 160/2010. The building supervisor is required to take the measures stipulated by the regulations. See attached comments
C-part of the message has been resent
-
1006200 – Selhella 5, alteration
Framleiðslan ehf submitted on 11.06.10 alterations to the internal space and fire design in accordance with drawings by Brynjar Einarsson dated 15.03.10. On 10.06.11, new drawings were received with a report from the fire brigade.
The Planning and Building Officer has deferred the matter as the submitted documents are insufficient. Please see the attached comments.
-